How bubbles are sized: risked asset value
ProducersNet present value of the mines in production, from the company’s latest technical report (NI 43-101 / S-K 1300) at the study’s discount rate, after tax, × 1.0.
DevelopersAfter-tax NPV from the latest study, discounted by stage: PEA × 0.30, PFS × 0.45, FS × 0.60, permitted / in construction × 0.80.
Explorers with a resourceContained metal (measured + indicated, plus half of inferred) × spot price × an in-situ factor for the metal: gold 2.0%, silver 1.5%, copper 0.7%, uranium 1.5%, lithium 0.8%, other 1.0% — roughly what the market pays per resource ounce or pound before a study.
Grassroots explorersNo resource yet, so market cap stands in. Drawn with a dashed outline so nobody mistakes it for a valuation.
Value gapRisked asset value ÷ market cap. Bigger means more asset value for each dollar of market cap.
Cash runwayCash ÷ quarterly operating cash burn × 3, in months. Drawn as an arc: a full ring is 24+ months; neutral over 12 months, amber at 6–12, orange under 6. Producers with positive operating cash flow show a full ring and read Self-funding.
DrillingA pulsing blue ring means the company has said in a news release within the last 60 days that a drill programme is under way. The panel shows metres drilled against plan, rigs and when results are due — as stated in that release.
AssaysThe white badge counts samples or holes the company says are at the lab awaiting results, from its latest release.
News todayA NEWS tag marks a company that published a news release today, labelled by type.
ColourNet open-market insider buying vs selling over 90 days (Form 4). Grey = no insider trades on file, which includes every Canadian-only listing: SEDI blocks automated access.